Sofitel Hotel - Riyadh

High-End Interior Execution for a Five-Star Hospitality Landmark
December 3, 2025 by
Sofitel Hotel - Riyadh
Sana Al Jazira Co. Ltd.

Integrated Fit-out for a Landmark Hotel

Location

Riyadh

Sector

Hospitality

Year

2025

Key Quantities

12,500m²

Scope

Fit-out

The Sofitel Riyadh Hotel, delivered under the main contractor MOBCO, required a complete high-end interior fit-out package aligned with the brand’s international luxury standards. Our scope covered a wide spectrum of architectural and decorative works, including stainless steel fabrication, custom woodwork, specialty glass elements, GRC and GRG components, and bespoke Corian installations. 

The project demanded exceptional finish quality, precise detailing, and seamless coordination across multiple material disciplines to achieve the hotel’s refined design intent.

Challenges


The project included several technically demanding aspects due to the integration of different materials with each other:

  • The sculptural Egg Pod feature required precise engineering and multi-material coordination to achieve its curved geometry, structural integration, and strict dimensional accuracy. 
  • Premium stainless steel, wood, glass, Corian, GRC, and GRG elements demanded flawless workmanship and controlled installation to meet luxury-grade hospitality standards. 
  • Coordinating interfaces between multiple trades required carefully sequenced installation and strict adherence to tolerances to maintain consistency across all interior systems.

Our Solutions


Technical Approach

  • Developed detailed multi-material shop drawings ensuring full compatibility of joineries.

  • Engineered the Pod using a hybrid approach combining GRG shaping, internal reinforcement, and surface finishing techniques to achieve a smooth, seamless, and structurally stable form. 

  • Established strict QA/QC procedures to maintain consistent finish quality across all luxury materials. 

  • Utilized CNC fabrication, precision moulding, and calibrated jigs to achieve accuracy across curved and compound surfaces.


Execution

  • Implemented parallel production workflows for each material package to meet the fast-track schedule. 

  • Delivered the Egg Pod installation using controlled lifting, guided positioning, and multi-stage finishing to achieve its iconic sculptural appearance. 

  • Ensured all works were executed to hospitality-grade tolerances, delivering a unified and polished interior environment consistent with Sofitel’s international design standards.